WIND LEADERS ARRIVE IN DALLAS TO DISCUSS FUTURE OF US WIND INDUSTRY


Dallas, Texas – On Sunday, May 23 Dallas Mayor Tom Leppert, GE executives and industry leaders will hold
a media availability to commence WINDPOWER 2010 and to discuss the challenges facing the US wind
industry. At the media availability, Mayor Leppert will also be signing a 131-foot GE wind turbine blade, to
pledge support for a clean energy future.
The GE wind turbine blade, which features the message: “I’m helping to build America’s energy future” – a
cleaner, smarter future that will create new clean energy jobs has been on a 28-day “Capture the Wind” tour
from Aberdeen, South Dakota to Dallas. The blade, which will be on display throughout the media availability,
has served as a traveling petition that thousands of people have signed to show their support for America’s
clean energy future.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: